From Quotation to Production
Discover our order processing workflow, from project review and quotation confirmation to engineering design, drawing approval and final production release, ensuring every detail is clearly confirmed before manufacturing begins.
- Project Review
- Engineering Design
- Drawing Approval
- Production Release
Order Processing
OUR ORDER PROCESSING FLOW
Six controlled steps connect project requirements, commercial confirmation, engineering design and formal production release.
01
Requirement & Drawing Review
Review warehouse layout and overall project information.
Confirm racking configuration and dimensional data.
Verify load capacity and required product quantities.
Clarify all key technical parameters and customer requirements.
02
Quotation & Customer Confirmation
Prepare quotation based on verified requirements and drawings.
List complete racking specifications and quantities.
Include relevant supporting services and project details.
Obtain customer review and final quotation confirmation.
03
Product List Handover to Engineering Team
Compile the complete racking product list.
Organize all supporting components and accessories.
Standardize and transfer project data to engineering.
Ensure accurate handover from commercial requirements to technical design.
04
Technical Drawing Breakdown
Break down the complete racking solution into standard components.
Prepare production-level technical drawings.
Define detailed processing and manufacturing parameters.
Ensure documents meet formal production standards.
05
Drawing & Layout Final Approval
Provide finalized technical drawings and layout schemes.
Confirm dimensional data and equipment configurations.
Verify quantities and on-site layout details.
Obtain the customer’s final approval before production.
06
Formal Production Release
Confirm all drawings, schemes and project details.
Engineering formally issues approved production documents.
Production begins under standardized manufacturing procedures.
Manufacture strictly according to approved specifications, drawings and quantities.
01Requirement Review
→
02Quotation Confirmation
→
03Engineering Handover
→
04Drawing Breakdown
→
05Final Approval
→
06Production Release
Nothing goes into production until all key technical details, drawings, quantities and layout requirements are fully reviewed and approved.